Industrial bracket assembly Airbus
Installation of industrial brackets and cantilever arms at the Airbus Hamburg-Stade site – support systems for supply and media lines in production halls.
Realised projects
Projects in electrical engineering, photovoltaics, PUR insulation and industrial systems – fixed prices, DIN/VDE compliant, nationwide.
Installation of industrial brackets and cantilever arms at the Airbus Hamburg-Stade site – support systems for supply and media lines in production halls.
Low-voltage main distribution with generator transfer and UPS integration.
Closed-cell PUR foam on trapezoidal sheet roof, WLG 023.
Complete electrical installation of production hall with machine connections.
Office complex – structured cabling per EN 50173 incl. measurement protocol, 25-year warranty.
Intrusion detection system with video surveillance, connected to alarm centre.
Replacement of existing lighting with LED hall luminaires at the Airbus Hamburg-Stade site – incl. emergency lighting and distribution adaptation per DIN VDE 0100-560.
Industrial support system assembly and steel structure at Airbus Hamburg-Stade – brackets for supply systems in production areas.
Industrial wiring and control technology with DIN VDE-compliant connections.
LV main distribution with selective protection and Type 1+2 surge arresters.
On-roof PV with hybrid inverter, 20 kWh LiFePO4 storage and wallbox integration.
Installation of industrial lighting systems in production halls at Airbus Hamburg-Stade – LED hall luminaires with emergency lighting per DIN VDE 0100-560.
No projects in this category
Please choose a different category.
More references with full photo documentation on request.
Get in Touch